Installation of Brewers Hill Middle School air conditioning for server
room:
Orion
air conditioning & refrigeration ltd were asked to install
new air conditioning
heat-pump units for the Brewers Hill Middle School, Bedfordshire.
Brewers Hill Middle School is a 1950's Building with around
100 meters/Squared of IT classroom area that needed cooling.
What
units were installed in Brewers Hill Middle School air conditioning
heat-pump project:
1
x
Mitsubishi Electric MSH-GA50VB Wall Mounted (5
kW /17000Btu) Air Conditioning
(wide and long airflow)
Air Conditioning heat pump units
which provided enough cooling for the large IT area in the building. These units have a
amazing COP 3.65 initial input on which means that every
1000w of electrical energy going in produces 3650 watts of cooling. For
more information on heat-pump inverters please
here.
Background of the
Brewers Hill Middle School
air conditioning heat-pumps:
The school was quoted on various cooling systems
including but the Mitsubishi air conditioning systems provided a great
value way of cooling within a short space of time and
with little cost and also reduces CO2 emissions.
Brewers Hill Middle
School air conditioning efficiency and CO2 emissions:
This school air conditioning systems, took around half a hour to
cool fully but once
cool the outdoor unit only ran intermittently because the
temperature had been reached therefore just pumping small amounts
of cooling in to maintain temperature. The 100msq area was consuming 10 Amps/phase
on 1phase 240V supply. This works out to be around 20p/hour to heat this
area and reduced CO2 emissions by at least 40%..
Brewers Hill School installation criteria:
This school air conditioning
heat-pump installation was undertaken by lead engineer Sean Handley with
assistance from installation engineer Geza Toth, (both
employed and trained by Orion). All pipe and services were
installed on the outside of the building on cable tray. The school air
conditioning heat-pump units have a life span of around 15 to 25 years
depending on their use. Installation time 4 days.
Approx
Installed Price of Project £9000 Inc VAT